Bridge Installation Lift Planning
Arch delivered a pioneering winter installation of a critical northern bridge, combining innovative lifting techniques and rigorous safety protocols to succeed in extreme remote conditions.
Arch delivered a pioneering winter installation of a critical northern bridge, combining innovative lifting techniques and rigorous safety protocols to succeed in extreme remote conditions.
Designed a Steep Slope Assist plan to move heavy equipment safely across steep, weather-hit terrain; ensuring steady bridge access.
Bridge Installation Lift: Arch engineered a precise lift plan for Colquitz River Bridge, ensuring safe girder placement in urban conditions.
For the crane dismantle lift, Arch delivered a precise operation on steep mountain slopes, ensuring safety in BC’s toughest terrain.
Arch engineered custom dolly and bracing systems for safe transport of heavy girders, solving complex Bridge Design & Logistics challenges.
Curved girders required a custom Girder Transportation Plan with precision rigging and dynamic load control for safe highway transport.
Herber River Bridge rebar was detailed for speed and accuracy, enabling smooth prefabrication and fast installation under urgent deadlines.
Arch engineered a smart, modular traffic deck system that kept downtown Broadway subway system moving smoothly during major construction.
Arch was tasked with the redesign of the Burnaby lake pavilion, successfully advancing the constructability and reliability of the project.
Arch executed engineering work for the Halfway River Pipe Bridge, including platform design, flood berms, and tandem girder lifts.