The consultant team at Arch Engineers have been very busy delivering high-quality design engineering, drafting and consulting services to a variety of industries – civil, residential, construction, mining, energy and oil & gas.

Partner with us for cutting-edge engineering solutions tailored to your needs.

Filter
Bevan Street Residential Demolition
Arch Engineers managed Bevan Street demolitions, ensuring safe, timely, and compliant site preparation for future non-market housing.
Non-Market Housing Utility Management
Arch Engineers led non-market housing upgrades, managing roads, utilities, and heritage site care across six expanding project sites.
Utility Upgrades for Non-Market Housing
Arch Engineers managed utility upgrades for non-market housing sites, coordinating with multiple providers for seamless, efficient delivery.
Winter Lights
Arch Engineers managed Burnaby’s Winter Lights installation, delivering innovative, energy-efficient displays across city venues.
Cameron Community Centre Development
Temporary Cameron Community Centre delivered through full-scope project management, stakeholder coordination, and adaptive space repurposing.
Precast Floating Dock Design
Execution planning for a Precast Floating Dock and breakwater system supporting WoodfibreLNG’s coastal infrastructure in Squamish, BC.
The Sphere at the Venetian
Served as Owner’s Rep on the $2.7B Sphere Venetian project, handling quality checks, documentation, and coordination across all major systems.
Coastal Gaslink – Endako Isolation
Arch Engineers isolated a salmon habitat riverbed for Coastal Gaslink using an eco-sensitive, technically complex method that met all regs and deadlines.
Coastal Gaslink - Endako Entry
Engineered a custom strut system and hydro-barrier for Coastal Gaslink that deployed a rapid stabilization strategy and safeguarded sensitive waterways.
Trans Mountain Expansion – Clearwater DPI Entry
Arch delivered urgent structural solutions for the entry way that stabilized the excavation and safeguarded thruster installation in Clearwater.
Deep Valley South Excavation
Arch Engineers designed a deep excavation support system in a South Valley creek area, using struts to manage unstable soils and protect the environment.
Aluminium Frame Dock
Arch Engineers optimized dock float designs for recreational vessel loading, enhancing stability, durability, and maintenance efficiency.
Community Pool Concrete Re-decking
Arch Engineers managed pool concrete re-decking at a strata complex, ensuring safety, compliance, and quality from survey to permits through construction.
Residential Retaining Walls
Arch Engineers redesigned residential retaining walls for a North Vancouver home, overcoming city constraints to ensure support and stability.
Material Stockpile Management
Arch Engineers improved stockpile management and mitigation to reduce geohazards in road construction, enhancing safety and environmental compliance.
Slope Stabilization and Excavation Shoring on Pipeline
Arch Engineers provided pipeline slope stabilization and excavation shoring designs for 200+ projects, ensuring strength and security.
Clearwater DPI
Arch Engineers revised DPI pit designs during construction to address boulders and maintain schedule on the trenchless crossing.
Valemount KP541 Pits
A misapplied design from an adjacent contractor led to critical instability—Arch Engineers stepped in to halt work, stabilize the site, and safely guide the project to completion.
Fish Habitat Offsetting Plan
Arch engineered 600 m of deep shoring through wetlands; blending access and ecology as part of a bold Fish Habitat Offsetting Plan.
Endako River Sheet Pile and Shoring Design
Engineered deep pits and sheet pile shoring for in-water isolation, enabling major HDD installation under pressing timelines.
TransMountain Expansion – Underpass & Retaining Wall
Engineered underpass, retaining wall, and bridge abutments to support heavy pipe and equipment loads along the Trans Mountain Expansion.
Two-Level Retaining Wall
Designed curved two-tier block retaining wall to increase yard space and protect the driveway while meeting terrain and utility factors.
Steel Building and Foundation
Seismic-compliant steel building foundation and structure designed to support heavy-duty gantry crane operations in a custom workshop.
Steel Building and Foundation Workshop Extension
Scalable two-phase workshop expansion built on a steel building foundation; engineered for durability, efficiency, and scalability.
Residential Steel & Timber Cantilevered Deck
A striking cantilevered steel timber deck with concrete enhancements, built to endure steep slopes and blend with the creekside setting.
Christie Cove Personal Residence
An off-grid coastal personal residence retreat engineered for resilience, independence, and modern luxury.
Marine Rail Crane Integration
Custom marine rail crane design, tight shipboard constraints, Arch delivered seamless movement through bulkheads and into the engine room.
Ferry Sponson Installation
An engineered welding sequence and smart bracing layout enabled hands-free sponson installation on the Nelson Ferry sponson.
Crane Recovery Lift Plan
Expertly crafted a recovery lift plan that enabled safe crane recovery on steep terrain, minimizing downtime and ensuring site safety.
Two Crane Tandem Lift Plan
Arch developed a tailored two crane tandem lift plan that ensured the safe and efficient handling of a critical heavy pile oscillator.
Transmountain Expansion – Aerial Pipeline
Arch engineered critical aerial pipeline design; demonstrating agility and precision in a complex bridge installation.
Bridge Installation Lift Planning
Arch delivered a pioneering winter installation of a critical northern bridge, combining innovative lifting techniques and rigorous safety protocols to succeed in extreme remote conditions.
ECS2 Steep Slope Travel Assist Plan
Designed a Steep Slope Assist plan to move heavy equipment safely across steep, weather-hit terrain; ensuring steady bridge access.
ECS2 Steep Slope Civil Engineering
Delivered steep slope engineering and access design for a 22% grade corridor, enabling safe transport of oversized loads in rugged terrain.
Colquitz River Bridge Installation Lift Plan
Bridge Installation Lift: Arch engineered a precise lift plan for Colquitz River Bridge, ensuring safe girder placement in urban conditions.
Cable Crane Dismantle and Lift Plan
For the crane dismantle lift, Arch delivered a precise operation on steep mountain slopes, ensuring safety in BC’s toughest terrain.
HWY5 Bridge Design & Logistics
Arch engineered custom dolly and bracing systems for safe transport of heavy girders, solving complex Bridge Design & Logistics challenges.
Eagle Mountain Pipeline
Arch delivered the geotechnical and traffic strategy that kept the Eagle Mountain Pipeline moving safely and on schedule.
Keating Cross Girder Transportation Plan
Curved girders required a custom Girder Transportation Plan with precision rigging and dynamic load control for safe highway transport.
Dewdney Bridge Girder Transportation Plan
Arch engineered a bridge girder transportation plan using straight geometry for a safe and efficient delivery strategy.
Rail Car Barge Ramp Demolition
Arch oversaw high-capacity crane lifts at the Rail Car Ramp, ensuring full regulatory compliance and protection of the nearby waterway.
Debarking Building Staged Demolition
Arch supported the Staged Demolition with on-site engineering, enabling safe, efficient dismantling of complex steel and concrete elements.
Main Building Staged Demolition
Faced with undocumented changes, Arch led a fast-tracked building demolition with rapid steps that kept crews moving and ahead of schedule.
Pulp Mill Staged Demolition
Built a full 3D model for the mill demolition and stayed on-site to guide crews safely through each staged challenge, day by day.
Bevan Street Residential Demolition
Led fast-tracked residential demolition of five city properties, managing permits and coordinating housing project's on time and budget.
RO-RO Dock-Ramp Refurbishment
We delivered a MoTI-approved marine access deck with Ro-Ro support at Darrell Bay, meeting strict LNG safety and stakeholder requirements.
Manion Bay Counter-Weighted Dock Ramp
This aluminum gangway uses a smart counter-weighted system and efficient lattice design to deliver safe, durable access in marine settings.
Bowen Island Counter-Weighted Dock Ramp
Delivered a cost-efficient, innovative counter-weighted dock ramp design that cuts materials while maintaining strength.
Pivoting Counterweighted Aluminium Dock & Ramp
Engineered a pivoting counterweighted bridge and storm-resistant dock ramp, solving marine challenges with innovative design.
Herber River Bridge
Herber River Bridge rebar was detailed for speed and accuracy, enabling smooth prefabrication and fast installation under urgent deadlines.
Leismer Bridge Inspections
Arch led data-driven Leismer Bridge inspections, meeting strict Canadian standards and ensuring safety and long-term clarity.
Broadway Subway Temporary Traffic Deck
Arch engineered a smart, modular traffic deck system that kept downtown Broadway subway system moving smoothly during major construction.
Yukon Suspension Bridge
Using cutting-edge inspection tech, Arch ensured the Yukon Suspension Bridge was safe and ready for its busy tourist season.
Burnaby Lake Pavilion Foundation Redesign
Arch was tasked with the redesign of the Burnaby lake pavilion, successfully advancing the constructability and reliability of the project.
Halfway River Pipe Bridge
Arch executed engineering work for the Halfway River Pipe Bridge, including platform design, flood berms, and tandem girder lifts.
Light Rail Transit Traffic Deck
Designed modular bridges for a light rail transit tunnel, ensuring safe access over curved excavations with minimal urban disruption.
HWY8 Bridge Replacement
Engineered a bridge replacement by analyzing composite strength, enhancing safety and sustainability, while meeting urgent project deadlines.
Bridge Bearing Replacement Under Traffic
Arch’s Bridge Bearing Replacement used an innovative jacking system to maintain traffic flow while ensuring safety and structural stability.
Qualicum Beach Golf Course Pedestrian Bridge
Arch engineered a custom launch solution for a straight-girder pedestrian bridge in Qualicum Beach, ensuring safe, smooth installation.
Crack-in-the-Earth Bridge Launch
Engineered bridge launch of cambered steel bridge over fragile canyon using custom connections and counterweights for safety.
Flood Protection with Retaining System
Rapid response to Groat 25 bridge flooding, designing a retaining wall with sheet piles and tie-backs for effective flood protection.
Darrel Bay Facility Refurbishment
Engineered and built personnel loading deck at Darrel Bay for safe transfer of workers from Ro-Ro dock to marine transport vessels.
California High Speed Rail Utility Corridor
Arch Engineers developed a tender package, assessed vendors, and supported contracts and planning for the High Speed Rail project.
Precast Floating Breakwater and Passenger Dock
Arch Engineers developed a CEP for the Passenger Dock, tackling pandemic challenges with clear, strategic planning for Woodfibre LNG’s success.
Cache Creek Bridge Demolition
Arch planned the Cache Creek Bridge demolition with a focus on sustainability, detailing, and transport for material salvage.
Quartz Creek Bridge Launch
Two teams resolved a Quartz Creek Bridge launch misalignment, enabling a tower-crane launch completed within 5mm of the design target.
Crooked Creek Bridge
Rapid formwork design for deep abutments and wingwalls kept the Crooked Creek Bridge project on schedule without compromising precision or safety.
Bowen Island Dock Ramp
Custom Dock Ramp with liftable counterweight system met tidal and wave demands through optimized detailing and robust design.
Thruster Excavation Support Shoring
With severe delay penalties on the line for contractors, Arch responded to this failed shoring box system with urgency and pragmatism.
Wollaston Lake Rd. Bridge Launch
A first-time bridge launch made seamless with smart rigging, detailed planning, and a ground-up girder assembly that kept everything on track.
Crane Assisted De-launch
Arch developed a crane-assisted de-launch methodology for the removal and salvage of a steel bridge, meeting stringent safety regulations.
Crooked Creek Bridge Cast Abutments
Arch delivered precise formwork designs for the 57-meter Crooked Creek Bridge, helping the project stay on schedule and ready for critical construction phases.
Taunton Bridge Deck
Arch coordinated design, drafting, and fabrication schedules across multiple teams, navigating conflicting stakeholder priorities to keep a complex infrastructure project on track and within budget.
Transmountain Expansion – Aerial Pipeline
Design-build scope for Transmountain Expansion: crane lift plans, truss & bearing design, pipe connections, and fabrication support.
Pipeline Installation Structural Design
Expert Pipeline Installation design for 250+ trenchless crossings, ensuring safe, efficient delivery on major pipeline projects.
Clearwater River Drill Head Recovery
Arch designed an urgent recovery plan for a trapped drill head beneath the Clearwater River, overcoming depth and unstable ground conditions.
Innovative Launch Nose Design
Asked to use an existing launch nose, and create a connection to an existing bridge design for a bridge launch scheduled to start in two weeks.
Precast Concrete Bridge Solutions
Arch specializes in precast concrete wing walls and abutments, delivering durable, climate-adapted designs with optimized rebar layouts.