ECS2 Steep Slope Civil Engineering
Delivered steep slope engineering and access design for a 22% grade corridor, enabling safe transport of oversized loads in rugged terrain.
Delivered steep slope engineering and access design for a 22% grade corridor, enabling safe transport of oversized loads in rugged terrain.
Bridge Installation Lift: Arch engineered a precise lift plan for Colquitz River Bridge, ensuring safe girder placement in urban conditions.
Arch engineered a bridge girder transportation plan using straight geometry for a safe and efficient delivery strategy.
Herber River Bridge rebar was detailed for speed and accuracy, enabling smooth prefabrication and fast installation under urgent deadlines.
Arch led data-driven Leismer Bridge inspections, meeting strict Canadian standards and ensuring safety and long-term clarity.
Arch engineered a smart, modular traffic deck system that kept downtown Broadway subway system moving smoothly during major construction.
Arch was tasked with the redesign of the Burnaby lake pavilion, successfully advancing the constructability and reliability of the project.
Designed modular bridges for a light rail transit tunnel, ensuring safe access over curved excavations with minimal urban disruption.
Engineered a bridge replacement by analyzing composite strength, enhancing safety and sustainability, while meeting urgent project deadlines.
Arch’s Bridge Bearing Replacement used an innovative jacking system to maintain traffic flow while ensuring safety and structural stability.