Halfway River Pipe Bridge
Arch executed engineering work for the Halfway River Pipe Bridge, including platform design, flood berms, and tandem girder lifts.
Arch executed engineering work for the Halfway River Pipe Bridge, including platform design, flood berms, and tandem girder lifts.
Designed modular bridges for a light rail transit tunnel, ensuring safe access over curved excavations with minimal urban disruption.
Engineered a bridge replacement by analyzing composite strength, enhancing safety and sustainability, while meeting urgent project deadlines.
Arch’s Bridge Bearing Replacement used an innovative jacking system to maintain traffic flow while ensuring safety and structural stability.
Arch engineered a custom launch solution for a straight-girder pedestrian bridge in Qualicum Beach, ensuring safe, smooth installation.
Engineered bridge launch of cambered steel bridge over fragile canyon using custom connections and counterweights for safety.
Rapid response to Groat 25 bridge flooding, designing a retaining wall with sheet piles and tie-backs for effective flood protection.
Engineered and built personnel loading deck at Darrel Bay for safe transfer of workers from Ro-Ro dock to marine transport vessels.
Arch planned the Cache Creek Bridge demolition with a focus on sustainability, detailing, and transport for material salvage.
Two teams resolved a Quartz Creek Bridge launch misalignment, enabling a tower-crane launch completed within 5mm of the design target.