by LaurenEBC | Oct 20, 2023
The project included the design and drafting of the formwork for the abutments and wingwalls for a 57 m long multi-girder composite bridge.
by LaurenEBC | Oct 20, 2023
Design and detailing of a 23 m long aluminium gangway bridge design with counterweight to permit bridge lifting during off-season. Additional scope of work involved optimization of the gangway bridge design to reduce material use while preserving structural...
by LaurenEBC | Sep 21, 2022
With severe delay penalties on the line for contractors, Arch responded to this failed shoring box system with urgency and pragmatism.
by LaurenEBC | Sep 20, 2022
Arch responded to an urgent request for engineering assistance on a bridge launch project in Northern Saskatchewan.
by LaurenEBC | Sep 19, 2022
As part of a BC pipeline project, these decommissioned bridges needed to be removed – Arch was selected to design the removal methodology.