Darrel Bay Facility Refurbishment

Darrel Bay Facility Refurbishment

Engineering, procurement, and construction of personnel loading deck for transfer of workers from an existing Ro-Ro dock to marine transport vessels. Scope included structural, mechanical, and electrical disciplines for lighting, stairs, and security railings. Scope...
California High Speed Rail Utility Corridor

California High Speed Rail Utility Corridor

Arch Engineers prepared the tender package for the precast concrete utility conduit for the California High Speed Rail project. To complete the tender documents our team of in-house engineers collaborated with contract design engineers providing specifications, vendor...
Precast Floating Breakwater and Passenger Dock

Precast Floating Breakwater and Passenger Dock

Arch Engineers provided the Construction Execution Plan for WoodfibreLNG’s floating breakwater and precast concrete dock in Squamish, BC. Our engineers conducted market analysis for both supply-chain and manufacturing capacity to fabricate, transport, and install a...
Cache Creek Bridge Demolition

Cache Creek Bridge Demolition

Plan, detailing, and drafting for the demolition and salvage of the Cache Creek Bridge including methodology, lift locations, and transportation. Salvaging included design of scaffolding beneath bridge and methodology for removal sequence for concrete and steel...
Quartz Creek Bridge Launch

Quartz Creek Bridge Launch

Created launch protocol and sequence for the design of 3-span curved, multi-steel-girder bridge. Conducted a safety assessment of the bridge installation procedure.