Crane Assisted De-launch
Arch developed a crane-assisted de-launch methodology for the removal and salvage of a steel bridge, meeting stringent safety regulations.
Arch developed a crane-assisted de-launch methodology for the removal and salvage of a steel bridge, meeting stringent safety regulations.
Arch delivered precise formwork designs for the 57-meter Crooked Creek Bridge, helping the project stay on schedule and ready for critical construction phases.
Arch coordinated design, drafting, and fabrication schedules across multiple teams, navigating conflicting stakeholder priorities to keep a complex infrastructure project on track and within budget.
Design-build scope for Transmountain Expansion: crane lift plans, truss & bearing design, pipe connections, and fabrication support.
Expert Pipeline Installation design for 250+ trenchless crossings, ensuring safe, efficient delivery on major pipeline projects.
Arch designed an urgent recovery plan for a trapped drill head beneath the Clearwater River, overcoming depth and unstable ground conditions.
Asked to use an existing launch nose, and create a connection to an existing bridge design for a bridge launch scheduled to start in two weeks.
Arch specializes in precast concrete wing walls and abutments, delivering durable, climate-adapted designs with optimized rebar layouts.