Leismer Bridge Inspections
Arch led data-driven Leismer Bridge inspections, meeting strict Canadian standards and ensuring safety and long-term clarity.
Arch led data-driven Leismer Bridge inspections, meeting strict Canadian standards and ensuring safety and long-term clarity.
Arch engineered a smart, modular traffic deck system that kept downtown Broadway subway system moving smoothly during major construction.
Using cutting-edge inspection tech, Arch ensured the Yukon Suspension Bridge was safe and ready for its busy tourist season.
Arch was tasked with the redesign of the Burnaby lake pavilion, successfully advancing the constructability and reliability of the project.
Arch executed engineering work for the Halfway River Pipe Bridge, including platform design, flood berms, and tandem girder lifts.
Designed modular bridges for a light rail transit tunnel, ensuring safe access over curved excavations with minimal urban disruption.
Engineered a bridge replacement by analyzing composite strength, enhancing safety and sustainability, while meeting urgent project deadlines.
Arch’s Bridge Bearing Replacement used an innovative jacking system to maintain traffic flow while ensuring safety and structural stability.
Arch engineered a custom launch solution for a straight-girder pedestrian bridge in Qualicum Beach, ensuring safe, smooth installation.
Engineered bridge launch of cambered steel bridge over fragile canyon using custom connections and counterweights for safety.