Rail Car Barge Ramp Demolition
Arch oversaw high-capacity crane lifts at the Rail Car Ramp, ensuring full regulatory compliance and protection of the nearby waterway.
Arch oversaw high-capacity crane lifts at the Rail Car Ramp, ensuring full regulatory compliance and protection of the nearby waterway.
Arch supported the Staged Demolition with on-site engineering, enabling safe, efficient dismantling of complex steel and concrete elements.
Faced with undocumented changes, Arch led a fast-tracked building demolition with rapid steps that kept crews moving and ahead of schedule.
Built a full 3D model for the mill demolition and stayed on-site to guide crews safely through each staged challenge, day by day.
Led fast-tracked residential demolition of five city properties, managing permits and coordinating housing project’s on time and budget.
We delivered a MoTI-approved marine access deck with Ro-Ro support at Darrell Bay, meeting strict LNG safety and stakeholder requirements.
This aluminum gangway uses a smart counter-weighted system and efficient lattice design to deliver safe, durable access in marine settings.
Delivered a cost-efficient, innovative counter-weighted dock ramp design that cuts materials while maintaining strength.
Engineered a pivoting counterweighted bridge and storm-resistant dock ramp, solving marine challenges with innovative design.
Herber River Bridge rebar was detailed for speed and accuracy, enabling smooth prefabrication and fast installation under urgent deadlines.