Coastal Gaslink – Endako Entry
Engineered a custom strut system and hydro-barrier for Coastal Gaslink that deployed a rapid stabilization strategy and safeguarded sensitive waterways.
Engineered a custom strut system and hydro-barrier for Coastal Gaslink that deployed a rapid stabilization strategy and safeguarded sensitive waterways.
Arch delivered urgent structural solutions for the entry way that stabilized the excavation and safeguarded thruster installation in Clearwater.
Arch Engineers designed a deep excavation support system in a South Valley creek area, using struts to manage unstable soils and protect the environment.
Arch Engineers provided pipeline slope stabilization and excavation shoring designs for 200+ projects, ensuring strength and security.
Arch Engineers revised DPI pit designs during construction to address boulders and maintain schedule on the trenchless crossing.
A misapplied design from an adjacent contractor led to critical instability—Arch Engineers stepped in to halt work, stabilize the site, and safely guide the project to completion.
Arch engineered 600 m of deep shoring through wetlands; blending access and ecology as part of a bold Fish Habitat Offsetting Plan.
Engineered deep pits and sheet pile shoring for in-water isolation, enabling major HDD installation under pressing timelines.
Rapid response to Groat 25 bridge flooding, designing a retaining wall with sheet piles and tie-backs for effective flood protection.
Arch Engineers developed a tender package, assessed vendors, and supported contracts and planning for the High Speed Rail project.