Project Management

Winer Lights

Winter Lights

Arch Engineers managed Burnaby’s Winter Lights installation, delivering innovative, energy-efficient displays across city venues.

The Sphere at the Venetian

Served as Owner’s Rep on the $2.7B Sphere Venetian project, handling quality checks, documentation, and coordination across all major systems.

Deep Valley South Excavation

Arch Engineers designed a deep excavation support system in a South Valley creek area, using struts to manage unstable soils and protect the environment.

Aluminium Frame Dock

Arch Engineers optimized dock float designs for recreational vessel loading, enhancing stability, durability, and maintenance efficiency.

Community Pool Concrete Re-decking

Arch Engineers managed pool concrete re-decking at a strata complex, ensuring safety, compliance, and quality from survey to permits through construction.

Retaining Wall

Two-Level Retaining Wall

Designed curved two-tier block retaining wall to increase yard space and protect the driveway while meeting terrain and utility factors.

Scroll to Top