Darrel Bay Facility Refurbishment
Engineering, procurement, and construction of personnel loading deck for transfer of workers from an existing Ro-Ro dock to marine transport vessels.
Engineering, procurement, and construction of personnel loading deck for transfer of workers from an existing Ro-Ro dock to marine transport vessels.
Arch Engineers provided the Construction Execution Plan for WoodfibreLNG’s floating breakwater and precast concrete dock in Squamish, BC.
Design and detailing of a 23 m long aluminium gangway bridge design with counterweight to permit bridge lifting during off-season.