Infrastructure

Crooked Creek Bridge

The project included the design and drafting of the formwork for the abutments and wingwalls for a 57 m long multi-girder composite bridge.

Cast-in-place Wingwalls and Abutment

Basing a design on a similar project, Arch included value engineering (lessons learned) from other projects to deliver this engineering formwork and drafting solution to the general contractor in less than 4 days.

Truss Bridge Pipe Rack

This Design-Build project included construction methodology, crane lift planning, engineered lift plans, truss bridge design, bearing designs, pipe connections, bearing design, as well as interfacing with the fabrication shop for delivery.

Scroll to Top