Steel Building and Foundation
Seismic-compliant steel building foundation and structure designed to support heavy-duty gantry crane operations in a custom workshop.
Seismic-compliant steel building foundation and structure designed to support heavy-duty gantry crane operations in a custom workshop.
Scalable two-phase workshop expansion built on a steel building foundation; engineered for durability, efficiency, and scalability.
Arch developed a tailored two crane tandem lift plan that ensured the safe and efficient handling of a critical heavy pile oscillator.
Arch supported the Staged Demolition with on-site engineering, enabling safe, efficient dismantling of complex steel and concrete elements.
Faced with undocumented changes, Arch led a fast-tracked building demolition with rapid steps that kept crews moving and ahead of schedule.
Built a full 3D model for the mill demolition and stayed on-site to guide crews safely through each staged challenge, day by day.
Engineered and built personnel loading deck at Darrel Bay for safe transfer of workers from Ro-Ro dock to marine transport vessels.
Asked to use an existing launch nose, and create a connection to an existing bridge design for a bridge launch scheduled to start in two weeks.