DPI Thruster Excavation Support Shoring (Urgent)
With severe delay penalties on the line for contractors, Arch responded to this failed shoring box system with urgency and pragmatism.
With severe delay penalties on the line for contractors, Arch responded to this failed shoring box system with urgency and pragmatism.
Provided severe right-of-way constraints, a flexible installation methodology was required to leverage the adjustible shoring design (by ARCH) and make the difficult pipe installation as easy as possible.
Major energy infrastructure projects most often operate under severe delay penalties, or speed incentives. Either way, production velocity is key to the General Contractor’s success or failure on a particular project.