Concrete

Cache Creek Bridge Demolition

Plan, detailing, and drafting for the demolition and salvage of the Cache Creek Bridge including methodology, lift locations, and transportation.

Crooked Creek Bridge

The project included the design and drafting of the formwork for the abutments and wingwalls for a 57 m long multi-girder composite bridge.

Cast-in-place Wingwalls and Abutment

Basing a design on a similar project, Arch included value engineering (lessons learned) from other projects to deliver this engineering formwork and drafting solution to the general contractor in less than 4 days.