California High Speed Rail Utility Corridor
Arch Engineers prepared the tender package for the precast concrete utility conduit for the California High Speed Rail project.
Arch Engineers prepared the tender package for the precast concrete utility conduit for the California High Speed Rail project.
Arch Engineers provided the Construction Execution Plan for WoodfibreLNG’s floating breakwater and precast concrete dock in Squamish, BC.
Plan, detailing, and drafting for the demolition and salvage of the Cache Creek Bridge including methodology, lift locations, and transportation.
The project included the design and drafting of the formwork for the abutments and wingwalls for a 57 m long multi-girder composite bridge.
Arch responded to an urgent request for engineering assistance on a bridge launch project in Northern Saskatchewan.
As part of a BC pipeline project, these decommissioned bridges needed to be removed – Arch was selected to design the removal methodology.
Basing a design on a similar project, Arch included value engineering (lessons learned) from other projects to deliver this engineering formwork and drafting solution to the general contractor in less than 4 days.
It’s not just the design of the precast shop drawings for the intended use, it’s also considering how you load, transport and unload.