by LaurenEBC | Sep 21, 2022
With severe delay penalties on the line for contractors, Arch responded to this failed shoring box system with urgency and pragmatism.
by LaurenEBC | Sep 19, 2022
As part of a BC pipeline project, these decommissioned bridges needed to be removed – Arch was selected to design the removal methodology.
by LaurenEBC | Sep 11, 2022
Technical specialists currently provide a valuable role in QAQC and validation of materials and manpower, both on and off-site. This being a T&M Contract, the scope burden for Arch Engineers is the monitoring and inspection of almost every aspect of the project;...