Precast Floating Breakwater and Passenger Dock
Construction execution plan
Squamish, BC
Project Summary
Arch Engineers provided the Construction Execution Plan for WoodfibreLNG’s floating breakwater and precast concrete dock in Squamish, BC.
Our engineers conducted market analysis for both supply-chain and manufacturing capacity to fabricate, transport, and install a 100m long floating breakwater and 40m personnel dock at WoodfigreLNG. Our team completed quantity surveying to include an ASCE Level 2 Schedule and Class 4 Budget within the plan.