by LaurenEBC | Oct 20, 2023
The project included the design and drafting of the formwork for the abutments and wingwalls for a 57 m long multi-girder composite bridge.
by LaurenEBC | Oct 20, 2023
Design and detailing of a 23 m long aluminium gangway bridge design with counterweight to permit bridge lifting during off-season. Additional scope of work involved optimization of the gangway bridge design to reduce material use while preserving structural...
by LaurenEBC | Oct 19, 2023
Arch performed program management, coordinating drawings among departments and sequencing 4 unique tender processes, each with its own schedule. Key to this project was stakeholder communication. Arch project managers coordinated internally with City of Burnaby...
by LaurenEBC | Oct 19, 2023
A known roadblock to development is that utility providers can have expected drawing production times of up to 18 months. With strong relationships to the utility providers, the Arch PMO team shortened the expected drawing turnaround date by 7 months, and in some...
by LaurenEBC | Oct 19, 2023
Arch Engineers took on the role of coordinating between the Owner’s Engineer (WSP) and the design-construction group where COWI was assigned the Approval Engineer, Arch took on design and drafting, SS Structures performed fabrication and manufacturing, SS and...