Arch Engineers provided the Construction Execution Plan for WoodfibreLNG’s floating breakwater and precast concrete dock in Squamish, BC.
Our engineers conducted market analysis for both supply-chain and manufacturing capacity to fabricate, transport, and install a 100m long floating breakwater and 40m personnel dock at WoodfigreLNG. Our team completed quantity surveying to include an ASCE Level 2 Schedule and Class 4 Budget within the plan.