For the construction of the 57-meter-long Crooked Creek multi-girder composite bridge, Arch Engineers played a pivotal role in meeting the project’s urgent scheduling demands. Our team was tasked with the rapid design and drafting of formwork for the bridge’s abutments and wingwalls, both essential structural components. Because the formwork reached depths exceeding 5 meters, it required exceptional precision and close attention to detail to ensure stability and safety.
Using both AutoCAD and Revit, our engineers developed a detailed formwork design that prioritized accuracy and efficiency. This approach allowed the team to stay aligned with the project’s accelerated schedule. Moreover, our prompt response ensured that all necessary temporary works were ready to support each critical construction phase.
As a result, the timely delivery of the design drawings contributed to a smooth and uninterrupted build process. Each stage progressed on schedule, avoiding costly delays and complications.
Arch’s ability to deliver fast, high-quality engineering solutions proved essential to the success of the Crooked Creek Bridge project. Furthermore, our continued focus on safety, quality, and constructability, despite intense time constraints, helped exceed stakeholder expectations. Ultimately, this project demonstrates our strength in delivering practical, reliable, and timely engineering services under pressure, reinforcing our role as a trusted partner in infrastructure development.