Solution & Impact
Basing a design on a similar project, Arch included value engineering (lessons learned) from other projects to deliver this engineering formwork and drafting solution to the general contractor in less than 4 days.
Design requirements included using the formwork specs provided by the general contractor, and solving for the issues specific to this site’s challenges.