PROJECT

Bowen Island Dock Ramp

SCOPE

Arch Engineers designed a 23m aluminum gangway bridge with an innovative counterweight system, optimizing material use while ensuring durability and safety. Our tailored solution addressed extreme tidal variations, meeting diverse environmental challenges.

LOCATION

Bowen Island, BC

PROJECT SUMMARY

Our team successfully engineered a 23-meter long aluminum gangway bridge, innovatively designed with a counterweight system to facilitate lifting during the off-season. This project not only demanded a precise engineering solution but also required a design that adapts seamlessly to all weather conditions and wave states. Through meticulous planning and engineering, we optimized the gangway bridge design, significantly reducing material usage while maintaining robust structural integrity. This approach not only met but exceeded the functional requirements, ensuring durability and safety in diverse environmental conditions.

In delivering this project, our expertise was further demonstrated in our ability to handle extreme tidal variations, ensuring full functionality throughout varying water levels. We provided comprehensive design and detailing, including design drawings, fabrication drawings, and a well-defined construction methodology. This holistic delivery underscores our capability to develop tailored engineering solutions that address complex challenges in dynamic environments, solidifying our reputation as leaders in innovative engineering practices.

👉 More project data 

/Projects 

HAVE A NEW PROJECT IN MIND? LET’S DISCUSS.

Scroll to Top